Wasatch Front Resource Library

When the next Wasatch Front earthquake hits, water could be one of the biggest problems.

This page brings together official Utah and federal sources on earthquake probability, water outage modeling, and current infrastructure projects designed to reduce that risk.

43%
Chance of M6.75+ quake
in next 50 years
379K
Households without water
on Day 1 (M7.0 scenario)
$50M
Appropriated by legislature
for aqueduct resilience
Explore Sources
01 β€” Earthquake Likelihood

The earthquake risk is real

Utah's own geologic hazard authorities say the Wasatch Front faces a significant chance of a major earthquake. The Utah Geological Survey reports a 43% probability of one or more M6.75+ earthquakes in the Wasatch Front region over 50 years, and a 57% probability of one or more M6.0+ events. That is the foundation for why water system resilience matters so much.

02 β€” Modeled Water Impact

A major quake could disrupt drinking water for a long time

The strongest evidence here comes from scenario modeling, not guesswork. In the official ShakeOut Salt Lake City Segment M7.0 scenario, the modeled impact shows 379,120 households without potable water on Day 1 β€” including 323,845 in Salt Lake County and 53,745 in Davis County.

Additional Utah earthquake briefing materials used in state policy settings warn that damage to critical aqueducts and utilities could leave roughly 330,000 homes without drinking water and/or sewer service for up to three months. That makes this more than a short-term inconvenience β€” it becomes a prolonged household resilience problem.

Key Numbers from the SLC M7.0 Scenario

Projected losses across 12 northern Utah counties from a magnitude 7.0 on the Salt Lake City segment of the Wasatch fault:

  • 379,120 households without potable water on Day 1
  • 2,000–2,500 fatalities; 7,400–9,300 life-threatening injuries
  • 97,700 displaced households needing shelter
  • $33.2 billion in direct economic losses (2015 estimate; $52B+ adjusted to current dollars)
  • 55,400 buildings completely damaged; 61% of all structures moderately damaged or destroyed
  • Water, electricity, gas, and sewer impacted or unavailable for days to months
03 β€” Infrastructure Vulnerability

Why the Wasatch Front water system is vulnerable

A large share of Wasatch Front water infrastructure crosses fault zones, landslide areas, liquefaction zones, and high ground-shaking areas. In a 2024 Utah legislative presentation, the Utah Division of Water Resources said these aqueducts serve over 2 million residents and are susceptible to major damage as they cross those hazard areas.

The Four Critical Aqueducts

  • Davis Aqueduct β€” Serves 650,000+ in Davis County. Built in the 1950s. Directly crosses the Wasatch Fault.
  • Salt Lake Aqueduct β€” 42 miles from Deer Creek Reservoir to SLC. Built 1940–1951. Crosses fault lines 4–5 times along Wasatch Blvd.
  • Alpine Aqueduct (Reach 1) β€” Delivers water to 1.6 million people from Provo Canyon to SLC Airport. Built 1978–1980. Located in an active landslide zone.
  • Jordan Aqueduct β€” Connects the Central Utah Project to the Salt Lake Valley. At risk from both seismic activity and liquefaction.

Why these systems are exposed

  • Fault crossings can physically offset pipelines during surface rupture β€” up to 20 feet of displacement
  • Liquefaction in the valley's lakebed soils can damage buried lines and facilities across wide areas
  • Landslides can break or deform aqueduct segments, especially near canyon mouths
  • Restoration time is measured in months, not days β€” custom replacement pipe must be manufactured and shipped
04 β€” State Funding & Policy

Utah is already funding aqueduct resilience

This is one of the most important parts of this page, because it shows the problem is already recognized by state leaders. The Utah Legislature provided $50 million in September 2023 for Wasatch Front aqueduct resilience projects. Eligible projects had to cross the Wasatch Fault Zone, provide drinking water, and serve at least 20,000 people.

A 2024 state presentation on Wasatch Front aqueduct resilience said these aqueducts serve over 2 million residents and laid out the broader effort for hardening critical infrastructure. The total estimated cost to bring all four systems up to seismic resilience is $554 million β€” meaning roughly $500 million in need remains after initial appropriations.

πŸ’°

KSL β€” $50 Million Legislative Appropriation for Aqueduct Resilience (2023)

The Utah Legislature appropriated $50M for Wasatch Front aqueduct seismic upgrades β€” roughly one-third of the identified $175M funding gap. Covers systems crossing the Wasatch Fault serving 20,000+ people.

News
πŸ“„

Utah Legislature Interim Briefing β€” Aqueduct Project Details

Technical briefing to legislators with cost breakdowns: SLA 13 segments = $323M; Alpine = ~$100M; Davis = $81M. Details on funding sources and federal grants.

PDF
πŸ“‹

2024 USSC Report & Recommendations to the Legislature

Five priority actions: invest $125M more in aqueduct improvements; $4M for school URM evaluations; $300K/year for public URM awareness; building code enforcement; earthquake early warning system.

Policy
πŸ“‹

2022 USSC Report β€” Earthquake Priorities

The earlier report that launched legislative action. Key finding: if any one pipeline broke, hundreds of thousands would be without water for six months or longer.

Policy
πŸ“°

Deseret News β€” "A Northern Utah Project Vital for Future Water Delivery"

Deep dive on the Davis Aqueduct project, FEMA's risk designation for the Wasatch Front, and the $500M+ total remaining need across all four systems.

News
πŸ“°

KSL β€” Why Water Property Taxes Are Going Up in SLC & Sandy

Metropolitan Water District explains rate increases funding seismic adjustments to the Salt Lake Aqueduct, Deer Creek Dam intake improvements, and Northwest Quadrant upgrades.

News
05 β€” Current Projects

Projects designed to reduce earthquake water risk

Utah water districts are not just talking about the problem β€” they are building around it. Construction is underway on multiple major aqueduct resilience projects, with specialized earthquake-resistant pipe and new alignments designed to avoid known hazard zones.

2025–2027 Β· ~$100 Million

Alpine Aqueduct Reach 1 Replacement (Orem / Provo Canyon)

Construction began March 2025. Rerouting the pipeline that serves 1.6 million people out of an active landslide zone near Provo Canyon. Includes a 1,000-foot tunnel through rock and installation of 108-inch earthquake-resistant Japanese specialty pipe that can elongate, rotate, and compress during seismic events. Expected completion early 2027.

KUTV Coverage β†’   WW Clyde Project β†’
2024–2026 Β· $81 Million

Davis Aqueduct Reach 1 Parallel Pipeline (South Weber / Layton)

2.2 miles of 72-inch welded steel pipe with flexible seismic joints at fault crossings, plus two new pump stations. Replaces the 1950s-era Davis Aqueduct serving 650,000+ residents. Phase 1 expected complete fall 2025; second parallel pipeline planned 8–10 years later.

Div. of Water Resources β†’   KSL Coverage β†’   Standard-Examiner β†’
2024–ongoing Β· $323M Total Need

Salt Lake Aqueduct Seismic Upgrades (Cottonwoods Conduit)

Metropolitan Water District replacing vulnerable sections of the 42-mile aqueduct with Seismic Performance Level 3 pipe. Also completely rebuilding the Big Cottonwood Water Treatment Plant. 13 pipeline segments identified as at risk; 4 most critical segments being addressed first.

KSL: Funding β†’   Treatment Plant Rebuild β†’
Ongoing Research

Earthquake Early Warning System

UGS/UUSS study on a ShakeAlert-style early warning system for Utah. Would provide seconds to minutes of warning β€” enough to shut down trains, trigger automated infrastructure protection, and alert residents. Legislature funded the feasibility study in 2022; ~$40M allocated for implementation.

UGS EEW Update β†’
06 β€” Utah Is Already Preparing

Earthquake preparation is shaping major Utah projects

The seismic risk isn't abstract β€” it's already driving real construction decisions across the state. Major institutions and government agencies are investing billions in seismic preparation right now.

Salt Lake Temple Seismic Retrofit

The Salt Lake Temple is undergoing a comprehensive, multi-year seismic upgrade β€” one of the most visible earthquake preparation projects in Utah. The renovation includes new footings and base isolators designed to limit movement during an earthquake. This is a powerful local proof point that major institutions are preparing for seismic risk now, not someday.

07 β€” Watch & Explore

See it to understand it

Some people connect better with maps, renderings, and video than with PDFs. This section brings together interactive maps, scenario documents, and video in one place.

08 β€” Full Source Library

All sources, organized by category

Every source referenced above, plus additional research, hazard maps, and organizational links β€” grouped for easy reference. This library will grow over time.

Prepare before the system is stressed

The sources above make one thing clear: a major Wasatch Front earthquake could create a prolonged water disruption for hundreds of thousands of households. Preparation is far easier before that day arrives.